DD PLATFORM APPLICATION AND INSTALLATION MANUAL 8.15.2.5 Graduated Container An 3 gal (11 L) bucket, graduated in 1 qt. (.95 L) increments is recommended for most cooling systems. The container is needed to determine total cooling system capacity, measure coolant removed during drawdown test, and coolant expelled during air handling test, and measuring water supply flow rate for fill test. 8.15.2.6 Pressure Cap The pressure relief cap/valve must be functional and develop rated pressure. 8.15.2.7 Stop Watch A stop watch is used in conjunction with a graduated bucket to set flow rate for fill test and to record time to expel all entrained air after filling the system (deaeration time).
8.15.2.8 Light A flashlight or trouble light held against the sight glass or transparent tubing is helpful in observing coolant aeration. A light is also useful to look for top tank coolant agitation. 8.15.2.9 Water Supply and Hose A water supply and hose capable of flowing at minimum 3 gal/min. (11.35 L/min) should be available to conduct continuous and interrupted fill tests. A flow meter that can regulate rate and measure capacity is ideal. Normally a stop watch, graduated bucket, and a valve on the hose are needed to regulate water flow to the required fill rate.
8.15.2.10 Engine Loading Method The test facility should provide a method for fully loading the engine, in order to conduct cooling index tests. The loading method will vary with application and test site location. 8.15.2.11 Tape Measure Size and distance measurements of radiator assembly, fan components, and other related hardware are required to complete cooling system evaluation. All information subject to change without notice. 8-59 DDC-SVC-MAN-0073 Copyright © 2009 DETROIT DIESEL CORPORATION