EXHAUST SYSTEM 6.2.5 MATERIAL SPECIFICATIONS FOR PIPEWORK The minimum required exhaust pipe diameter for the DD Platform engines can be found at www.detroitdiesel.com. Detroit Diesel recommends AL409SS with a minimum wall thickness of 1.2 mm (0.047 in.) for all exhaust piping. The exhaust piping support must be secure, but still allow for thermal expansion and contraction. Mounting points should be on structurally sound members, such as the vehicle/vessel frame. Thermal insulation is required for all piping between the turbocharger and the ATD inlet in order to maintain as much exhaust temperature as possible within the exhaust flow.
The temperature of the exhaust gas as it reaches the inlet to the ATD is critical to both the function of the DOC as well as regeneration of the DPF. Double wall piping is common in automotive applications. Exposed exhaust system components should not be located near flammable or otherwise temperature sensitive materials. Insulating the exhaust system will reduce the heat radiation and noise level caused by the exhaust system. 6.3 DESIGN REQUIREMENTS The exhaust system for DD Platform powered vehicles must function under a variety of environmental conditions. Exposure to rain and snow and subjection to both thermal and mechanical stresses are inherent to vehicle operation.
6.3.1 TEMPERATURE DROP FROM TURBOCHARGER OUTLET TO AFTERTREATMENT DEVICE The temperature of the exhaust gas as it reaches the inlet to the ATD is critical in both the function of DOC and the regeneration of the DPF (passively and actively). The maximum temperature drop allowed from the turbo outlet to the ATD inlet is 30°C (54°F) throughout the entire operating range, including “high idle,” which is defined as the elevated rpm and load where a stationary regeneration may occur. In order to maintain this temperature drop and retain as much of the exhaust energy as possible, the exhaust piping between the turbo and the ATD will require either insulation or double wall tubing.
6.3.2 DISTANCE FROM HYDROCARBON DOSER TO ATD INLET A minimum of 0.8 meters (31 in.) of piping is required between the HC Doser and the inlet to the ATD. This length of piping is critical for the evaporation of fuel being injected into the exhaust stream during active regeneration. In the future, this specification may be modified to include a maximum length between the HC Doser and the ATD inlet. 6.3.3 OUTLET LOCATION Select the direction and location of the tailpipe exit to prevent the following: Recirculation of exhaust into the air inlet Recirculation of exhaust through the radiator and charge air cooler Recirculation of exhaust into cab 6-8 All information subject to change without notice.
DDC-SVC-MAN-0073 Copyright © 2009 DETROIT DIESEL CORPORATION