John Deere 450H, 550H, 650H — Blade Pitch Operation

Operation—Operating The Machine Blade Pitch Operation You may want to change the pitch of the blade depending on the type of work you are doing and the soil conditions you are dozing, or to change the feel of the dozer to operator's preference. Pitching the Blade Forward Advantages: T118184B —UN—25NOV98 With the top of blade pitched forward (A), the blade will not carry as much soil. The weight of the soil carried by the blade adds to the weight of the dozer and moves the balance of weight on the tracks forward. This can cause the front idlers of the crawler to sink in loose or soft soils. When the idlers sink, the blade cuts unevenly into the soil.

With the blade forward, the dozer balance does not change as much with a full blade; therefore, the tendency for idlers to sink is reduced. 450H Shown A—Forward Pitch B—Back Pitch With the blade forward, there is less of a tendency for dirt to come over the back of the blade when dozing uphill. It is also easier to drop dirt at the end of a push when dozing uphill or when dozing very sticky materials. blade when it is pitched back. Carrying more soil on the blade adds to the weight of the dozer. This added weight can increase push force in heavy soils. The soil carried by the blade also moves the balance of weight forward on the machine.

In heavy soils, this can be an advantage because the increased weight can help keep the front of the machine down and keep the cutting edge penetrating during heavy cutting. Pitching the Blade Back Advantages: With the blade pitched back (B), the cutting edge lies more horizontally resulting in a heavier cut into soils. Having the cutting edge more horizontal also provides a smoother cut in heavy soils. More soil is carried by the CED,OUO1032,1118 -19-24APR99-1/2 Changing the Pitch: To determine which link is assembled to the blade, look at the right side of the pitch link (A). Cast into the link will be one of the following: FORWARD, MID or BACK.

The standard pitch link is a universal (MID) position link. T118191C —UN—02DEC98 There are two optional pitch links available. The FORWARD link performs better in sand, stone grading and has best visibility to cutting edge. The BACK link performs better in cutting, backfilling, and moving large quantities of material. See your authorized dealer to obtain either of the optional links. A—Pitch Link CED,OUO1032,1118 -19-24APR99-2/2 2-2-28 070813 PN=66