. OPERATION OPERATION DUMP OPERATIONS WARNING N position, and set parking brake The dumping speed increases in proportion to the engine speed. 3 - 98 When dumping a load, always carry out the dumping operation in m the flagman. rate the dump body slowly. le it is still raised. accordance with the signals fro When dumping large rocks, ope Do not load the dump body whi When carrying out inspection w ith the dump body raised, a lways use the bo dy pivot pins, set the du mp lever to the HOLD positio n and l ock it securely. For details, see "BO DY PIVOT PIN (PAGE 3-37)". Operate the dump body as foll 1. 1. Plac e shift lever (1) at the valv e lever (2) to the PARK 2.
Mov e dump lever (3) to the RAISE position, then de press the accelerator pedal to raise the dump body. If the dump lever is released when it is at the RAISE position, it is held at the RAISE position and the dump body will continue 3. When the dump body rises body positioner adjustme to the previously set positi nt position), dump lev on (dump er (3) is returned to the HOLD posit that position. If it is necessary to raise t ion. The dump body is then held at he dump body further, move dump leve r (3) back to the RAIS E position and the dump body will rise. If dump lever (3) is rel eased when doing this, it will return to th the dump body will stop at that hat