. OPERATION OPERATION OPERATION OPERATION range display (4) changes as Goes out: Prelube operation completed 3 - 112 3. the right. (A): Lock leve (B): Flashes: hown on 4. Turn the key i n starting switch (2) to the START (C) position, then return it t o the ON (D) position . If the key i s released while it is at the STA RT (C) position, the key automatically r eturns to the ON (D) po sition. 5. hang the right, indic ates the prelube op eration is be ing performed. (B): Lights up: Prelube operation t aking place hown on 6. The prelube o peration is complete d in approx. 5 to 60 seconds. When this ha ppens, monitor pan ng (4) changes as s hown on the right.
(The time for the prelube operatio accordi ambient temp erature and the engi ne oil temperature to t he 7. panel lights u If the preheati ng lamp pilot lamp d oes no t light , go on to step 9.