. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE 4 - 25 10. Replace the cor rosion resistor, t hen open each valve For details of th e method of g th e corrosion r esistor, see "REPLA CE MAIN AND SU CARTRIDGE CARTRIDGE (P AGE 4-64)". 11. Add city water u ntil the wate r overflows fr om th e wate r fille r port. 12. To b leed the air from the cooling system, run th e engin e at low idle for 5 minutes, and fo r a further 5 minutes at high idle. (When doing this, l eav e the radiator c ap off. 13. Ope n cap (9) o f the coolan t reserve tan k, ad d wate the specified level, t hen tighten c ap ( 9). For d etails , see " CHECK COOLANT LEV EL, ADD COOLANT (PAGE 3- 14.
Sto p the engine, wait for approx. 3 minutes , then add ci ty water to n ear the mout h of the filler port , and tighten ca ps (4) and (5).