www.changlin.com.cn Caution: To prevent bearing damage newtubochargers must be prelubricated before start-up. Pour 50 to 60 [2 to 3 ounces] of clean engine oil into the oil supply fitting. Rotate the turbine wheel to allow the oil to enter the bearing housing. Install the exhaust oulet connection. Do not tighten the two mounting capscrews until the band clamp has been tightened. Torque Value: Band Clamp-8 N * m [6 ft-lb] Capscrews - 43 N*m [32 ft-lb] 16 mm Install the oil supply line. Torque Value: 15N*m [11 ft-lb] If equipped with a wastegate turbocharger, install the intake manifold pressure supply line from the boost capsule. 144 / 167 pages