CLAAS LEXION II (480 - 405) — gb 00 Deckblatt

CLAAS ACADEMY LEXION II Additional functions Key to diagram 359 - Hydraulic ram for belt tension 505 - Accumulator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.5 l / 100 bar 607 - Bleeding valve 608 - Filling valve 724 - Safety valve (burst plate) E - Bleeding connection F - Connection to filling pipe Filling instructions 1. Connect the filling line to the quick release coupling that is installed parallel to the hydraulic ram of the drum variator. 2. Connect the other end of the filling line to the filling screw (F) that is situated on the valve block of the track. 3. Unscrew the bleeding valve (607) about ј to Ѕ turn and lead the drain into a suitable container. 4.

Start the engine and then the threshing system. 5. Increase the speed of the threshing drum, which will in turn slowly open the filling valve (608), until the oil flows freely without air out of the bleeding valve (607). 6. Close the bleeding valve (607) 7. Increase the speed of the threshing drum for about another 50 sec . The pressure on the gauge of the filling line should be about 150 bar . 8. Close the filling valve (608) 9. Stop the engine and remove the filling line. Safety function Should the tracks of the machine be overloaded with a mechanical loading, then a burst plate (724) mounted on the valve block will blow and act as a safety valve.

When the overload occurs, then the high pressure will break the burst plate (724) and the oil will escape. Should this happen, then the burst plate (724) must be replaced. 11/2001 4-47