1B-26 AIR CONDITIONING 3. Tighten the line to the specified torque. 4. O-rings cannot be reused. Always replace with new ones. 5. Be sure to apply new specified compressor oil to the O-rings when connecting refrigerant line. Tighten: Refrigerant Line to 6 N m (0.6 kg m/4 lb ft) Pressure Switch 4 2 3 1 1 for GCC for Australia for Taiwan N1A0213E Legend 1. Receiver / drier 3. Triple pressure switch 2. Dual pressure switch 4. Pressure switch connector Removal Installation Preparation: Disconnect the battery ground cable. Discharge and recover refrigerant. 1. Pressure Switch Connector 2. Pressure Switch To install, follow the removal steps in the reverse order, noting the following points: 1.
O-ring cannot be reused. Always replace with a new one. 2. Be sure to apply new specified compressor oil to the O-ring when connecting pressure switch. 3. Tighten the pressure switch to the specified torque. Turn the pressure switch counterlockwise to re- move it. When removing the switch connected part, the connecting part should immediately be plugged or capped to prevent foreign matter from being mixed into the line. Tighten: Pressure switch to 10 N m (1.0 kg m/7.4 lb ft)