Maintenance - Section 4 OM4035.1 01/04 Page 4-12 Lubrication and Service 5000 HOUR LUBRICATION AND MAINTENANCE CHECKS Maintenance for every 10, 50, 100, 250, 500 & 1000 hour Lubrication and Maintenance Checks should also be carried out at this time. Truck Serial Number __________________________ Site Unit Number _____________________________ Date: __________ Hour Meter __________________ Name of Service Person _______________________ NOTE: "Lube Key" references are to the Lubrica- tion Specification Chart. 1.FRONT WHEELS - Drain oil and completely disas- semble and check all parts for wear or damage. Refer to Section "G" of the service manual for Disassembly and Assembly procedures.
Refill with oil. Check the oil level at oil level plug on wheel hub. Lube Key "C". Check wheel bearing preload at the first 500 hours after each rebuild. 2. AIR CLEANERS - Clean the Donaclone Tubes in the pre-cleaner section of the air filter. Use low pressure cold water or low pressure air to clean tubes. Refer to Section "C" of the service manual. NOTE: Do not use a hot pressure washer or high pres- sure air to clean tubes, high pressure causes pre- cleaner tubes to distort. COMMENTS CHECKED INITIALS