9. COMBINED BOOM UP AND BUCKET OPERATION ARM CYLINDER BUCKET CYLINDER BOOM CYLINDER TRAVEL MOTOR SWING MOTOR A2 PUMP A1 PUMP PILOT PUMP HYDRAULIC TANK 220S3HC25 When the boom up and bucket functions are operated, simultaneously each spool in the main control valve is moved to the functional position by the pilot oil pressure from the remote control valve. The oil from the A1 pump flows into the boom cylinders through the boom 2 spool in the left control valve. The oil from the A2 pump flows into the boom cylinders and bucket cylinder through the boom 1 spool, bucket spool and the parallel and confluence oil passage in the right control valve.
Also, when the boom up and bucket in functions are operated simultaneously, the boom up operation preference function is operated by the pilot pressure P04 and then the bucket spool transfers in the half stroke not full stroke (refer to page 2-35). Therefore, the most of pressurized oil flows into boom 1 spool than the bucket spool to make the boom up operation more preferential. The boom and bucket are operated.
3-31 BC1 N RV2 Cck R9 Co 05 Do Co Do OPTION Ca Da BC2 NRV1 Cco CoR AkR LCk1 LCk2 DoR P04 PBk PAk PCbc PBa2 PAa2 DR6 P02 PBa Abk PBrc PAbk DR4 LCo CaR DaR BUCKET Bucket in stroke limiter spool BbkR DR7 CRa PaL ARM1 LCa LCa2 ARM2 PAa2 DR6 Csp b2 BOOM2 Ccb SWING P/R LCar LCbk BbR ARM REGEN P02 Abk PBrc PAbk DR4 Cs Ds PCs PDs DR5 SWING P03 DR3 Ctl Dtl PCtl PDtl PattPS ( TR RIG AVH ET L) DR1 P01 PtrPS TS Cs Ds PCs PDs DR5 SWING LCs AbR LCb Relief valve CRb BOOM1 P03 R3 Ctl Dtl Ctl Dtl (RIGHT) PS TRAVEL DR1 BtR AtR (RIGHT) TRAVEL (LEFT) TRAVEL MRV