Hyundai Construction Equipment — 5. COMBINED OPERATION

10. COMBINED BOOM UP AND ARM OPERATION ARM CYLINDER BUCKET CYLINDER BOOM CYLINDER TRAVEL MOTOR SWING MOTOR A2 PUMP A1 PUMP PILOT PUMP HYDRAULIC TANK 220S3HC26 When the boom up and bucket functions are operated, simultaneously each spool in the main control valve is moved to the functional position by the pilot oil pressure from the remote control valve. The oil from the A1 pump flows into the boom cylinders and arm cylinder through the boom 2 spool and arm 1 spool in the left control valve. The oil from the A2 pump flows into the boom cylinders and arm cylinder through the boom 1 spool, arm 2 spool and the parallel and confluence oil passage in the right control valve.

Also, when the boom up and arm in functions are operated simultaneously, the boom up operation preference function is operated by the pilot pressure P02 and then the flow into arm 2 spool is reduced by shifting of the arm in flow limit spool. Therefore, the most of pressurized oil flows into boom 1 spool than the arm 2 spool to make the boom up operation more preferential. The boom and bucket are operated.

3-32 BC1 N RV2 Cck DR9 Co P05 Do PCo PDo OPTION Ca Holding valve Da BC2 NRV1 Cco CoR AkR LCk1 LCk2 Arm flow limit spool DoR P04 PBk PAk PCbc PBa2 PAa2 DR6 P02 PBa Abk PBrc PAbk DR4 LCo Relief valve CaR DaR BUCKET BbkR DR7 CRa PaL ARM1 Make up valve LCa LCa2 ARM2 PAa2 DR6 Csp Db2 BOOM2 Ccb SWING P/R LCar LCbk BbR ARM REGEN P02 Abk PBrc PAbk DR4 Cs Ds PCs PDs DR5 SWING LCs AbR LCb CRb BOOM1 P03 DR3 Ctl Dtl PCtl PDtl PattPS ( TR RIG AVH ET L) DR1 P01 PtrPS TS P03 DR3 Ctl Dtl PCtl PDtl (RIGHT) PS TRAVEL DR1 BtR AtR (LEFT) TRAVEL MRV