Hyundai Construction Equipment — 4. MECHATRONICS SYSTEM

2) SPEC : Actuator stop : 4~5 V Actuator operating : 0~1 V TEST PROCEDURE (1) Test 13 : Check voltage at CN-51 (1) and ground. Prepare 1 piece of thin sharp pin, steel or copper. Starting switch ON. Insert prepared pin to rear side of connectors : One pin to (1) of CN-51. Check voltage as figure. 刮 刯 到 CN-50 CN-51 刱 (2) Test 14 : Check voltage at CN-51 (13)and ground. Prepare 1 piece of thin sharp pin, steel or copper Starting switch ON. Insert prepared pin to rear side of connectors : One pin to (13)of CN-51. Check voltage as figure. 刮 CN-51 1 12 24 刯 到 25 36 Ground 刱 Multimeter CN-51 1 12 13 24 25 36 Ground Multimeter 210S6MS11A 6-53 Y R G MCU MPAORDTE NL O: :