Unit : Seconds / 20 m 7-5 3) TRAVEL SPEED (1) Measure the time required for the excavator to travel a 20 m test track. (2) Preparation 刮 Adjust the tension of both tracks to be equal. 刯 Prepare a flat and solid test track 20m in length, with extra length of 3 to 5 m on both ends for machine acceleration and deceleration. 到 Hold the bucket 0.3 to 0.5 m above the ground with the arm and bucket rolled in. 刱 Keep the hydraulic oil temperature at 50佳5˚C. (3) Measurement 刮Measure both the low and high speeds of the machine. 刯Before starting either the low or high speed tests, adjust the travel mode switch to the speed to be tested, then select the following switch positions. 余Power mode switch :
M mode 到Start traveling the machine in the acceleration zone with the travel levers at full stroke. 刱Measure the time required to travel 20 m. 刲After measuring the forward travel speed, turn the upperstructure 180佘 and measure the reverse travel speed. 刳Repeat steps 刱 and 刲 three times in each direction and calculate the average values. (4) Evaluation 0.3~0.5m 21097MS04 3~5m 20m 3~5m 21077MS05 he following specifications. The a verage measured time should meet t he following specifications. Model Travel speed Standard Maximum allowable Remarks HX210HD HX220HD 1 Speed 20.0佳2.0 25.0 2 Speed 12.7佳2.0 15.9