Hyundai Construction Equipment — 1. OPERATIONAL PERFORMANCE TEST

Unit : Seconds / 3 revolutions 7-6 4)TRACK REVOLUTION SPEED (1)Measure the track revolution cycle time with the track raised off ground. (2)Preparation 刮Adjust the tension of both side tracks to be equal. 刯On the track to be measured, mark one shoe with chalk. 到Swing the upperstructure 90佘and lower the bucket to raise the track off ground. Keep the boom-arm angle between 90 to 110佘as shown. Place blocks under machine frame. 刱Keep the hydraulic oil temperature at 50佳5˚C. (3)Measurement 刮Select the following switch positions. 余Travel mode switch : 1 or 2 speed 余Power mode switch : M mode 余Auto idle switch : OFF 刯Operate the travel control lever of the raised track in full forward and reverse.

到Rotate 1 turn, then measure time taken for next 3 revolutions. 刱Raise the other side of machine and repeat the procedure. 刲Repeat steps 到 and 刱 three times and calculate the average values. (4) Evaluation 90~110 Mark 21077MS06 90~110 Mark 21077MS06 刮 余 余 余 刯 到 刱 刲 4) E T he revolution cycle time of each track sho uld meet the following specifications. Model Travel speed Standard Maximum allowable HX210HD HX220HD 1 Speed 25.0佳2.0 31.3 2 Speed 16.3佳2.0 20.4