Hyundai Construction Equipment — 1. OPERATIONAL PERFORMANCE TEST

Unit : Seconds / 3 revolutions 7-8 6)SWING SPEED (1) Measure the time required to swing three complete turns. (2) Preparation 刮 Check the lubrication of the swing gear and swing bearing. 刯 Place the machine on flat, solid ground with ample space for swinging. Do not conduct this test on slopes. 到 With the arm rolled out and bucket rolled in, hold the bucket so that the height of the bucket pin is the same as the boom foot pin. The bucket must be empty. 刱 Keep the hydraulic oil temperature at 50佳5˚C. (3)Measurement 刮Select the following switch positions. 余Power mode switch : M mode 刯Operate swing control lever fully. 到Swing 1 turn and measure time taken to swing next 3 revolutions.

刱Repeat steps 刯 and 到 three time and calculate the average values. (4)Evaluation 21077MS07 21077MS07 The time required for 3 swings should meet the following specifications. Model Power mode switch Standard Maximum allowable 210HD, HX220HD M mode 14.7佳1.5 18.4