Hyundai Construction Equipment — 5. SWING DEVICE (TYPE 1, 2)

3) ASSEMBLING (1) Assemble shaft sub 刮 Put roller bearing (3) on preheater and provide heat to inner race. (Temperature in conveyor : 120 ¶ C for 3~5 minutes) 2209A8SM66 刯 Using a robot machine, assemble and press preheated roller bearing (3) into shaft (5). 2209A8SM67 (2) Assemble cylinder block sub 刮 Assemble 9 springs (cylinder block, 9) into cylinder block (8). 余 Spring 佴 9EA 2209A8SM68 刯 Assemble ball guide (10) into cylinder block (8). 余 Ball guide 佴 1EA 2209A8SM69 8-51