Hyundai Construction Equipment — 5. SWING DEVICE (TYPE 1, 2)

到 Assemble 9 piston assy (12) into retainer plate (11). 余 Piston assy 佴 9EA 余 Retainer plate 佴 1EA 2209A8SM70 刱 Assemble parts of procedure 刯 and 到 . 2209A8SM71 (3) Assemble valve casing sub 刮 Assemble make up check valve sub Assemble check valve (24), O-ring (27), plug (26) in that order and then screw it torque wrench. 余 Make up check valve 佴 2EA 余 Spring 佴 2EA 余 Plug 佴 2EA 余 O-ring 佴 2EA 2209A8SM72 刯 Assemble reactionless valve assy Assemble reactionless valve assy (31), plug (32), O-ring (33, 34) in that order and then screw it a torque wrench. 余 Reactionless valve assy (31) 佴 2EA 余 Plug (32) 佴 2EA 余 O-ring (33, 34) 佴 2EA 2209A8SM73 8-52