GROUP 10 UNDERCARRIAGE 1. TRACK LINK 1) REMOVAL (1) Move track link until master pin is over front idler in the position put wooden block as shown. Master pin Loosen tension of the track link. If track tension is not relieved when the grease valve is loosened, move the machine backwards and forwards. Unscrew the grease nipple after release the tension by pushing the poppet only when necessarily required. Grease leaking hole is not existing. So, while unscrew the grease nipple, grease is not leaking until the grease nipple is completely coming out. If the tension is not released in advance, the grease nipple can be suddenly popped out by pressurized grease.
(2) 侍 侍 Block (3) Push out master pin by using a suitable tool. 220S8UC01 (4) Move the machine slowly in reverse, and lay out track link assembly (1). Jack up the machine and put wooden block under the machine. Don't get close to the sprocket side as the track shoe plate may fall down on your feet. 侍 侍 1 8-161(2) 2) INSTALL (1) Carry out installation in the reverse order to removal. Adjust the tension of the track link. 侍 90 ~ 110 21074OP14 8-142