2. CARRIER ROLLER Frame 1) REMOVAL Loosen tension of the track link. (1) Grease valve 8-162(1) Jack up the track link height enough to permit carrier roller removal. (2) Jack Carrier roller 8-162(2) (3) Loosen the lock nut (1). (4) Open bracket(2) with a screwdriver, push out from inside, and remove carrier roller assembly. 余 Weight : 21 kg (46 lb ) 余 Tightening torque : 29.7 佳 4.5 kgf·m (215 佳 32.5 lbf 余 ft ) 2) INSTALL (1) Carry out installation in the reverse order to removal. 8-143 1 Carrier roller 2 8-162(3)