5) BUCKET OPERATION Bucket in operation (1) 刮 Bucket operation only During the bucket in operation, the pilot secondary pressure from the RCV is supplied to port of the spring side and shifts the bucket spool to the left direction. The P1 bypass passage is shut off by the movement of the bucket spool and the pressurized oil from P1 port entered P1 parallel passage and is directed to the Ak port through the check valve 2. At the same time, the pressurized oil from P1 bypass passage is directed to the AK port through the check valve 1. The return oil from the rod side of the bucket cylinder (Bk port) returns to the hydraulic oil tank through the tank passage.
刯 Combined operation When combined operation of the bucket and other actuators, mostly same as above operation but the fluid from P1 bypass passage is empty by the upstream operation such as the arm or boom operation. So only the fluid from P1 parallel passage is supplied to the Ak port. P1 bypass passage Tank passage RCV signal Bucket Option F-F' (OPTION AND BUCKET) 220S2MC26 2-40 Cylinder head side P1 parallel passag Ak