hyundai — 2. MAIN CONTROL VALVE

9) OPERATION OF OPTION SPOOL 1-way operation The pilot pressure is supplied to the port of the spring side and shifts spool to the left direction. The pilot secondary pressure from the RCV is supplied to the port of the spring opposite side of the option spool, the P2 bypass passage is shut off by the movement of the option spool and the pressurized oil from the P2 port flows into the actuator through the P2 parallel passage, the check valve, bridge passage and the Do port. (1) 侍 (2) 侍 - - 2-way operation Shifts spool to the left and right direction. When the spool shifts to the left, same as 1-way operation.

When the spool shifts to the right, the pressurized oil from the P2 port flows into the actuator through the P2 parallel passage, the check valve, bridge passage and the Co port. Bucket RCV signal Option P2 parallel passage Poppet check Co Do Cylinder head side Cylinder rod side F-F' (OPTION AND BUCKET) 220S2MC35 2-49