LIGHTWEIGHT TOWING HOOK OPERATION The shackle must always be used. Hold the rope level and direct it straight to the track frame. Move the machine slowly be careful not to apply any sudden load to the wire rope. The track frame has been equipped with a hook to pass the shackle for towing light objects. Permissible towing load: PC300-7L: Max. 154,000 N (16,000 lbf) Remark Keep in mind, towing the machine is only to be performed in emergency situations only. SEVERE JOB CONDITION When carrying out digging operations in water, if the work equipment mounting pin goes into the water, carry out greasing every time the operation is carried out.
For heavy-duty operations and deep digging, carry out greasing of the work equipment mounting pins every time before operation. After greasing, operate the boom, arm and bucket several times, then grease again. PC400LC-7E0 2-131