Hitachi Construction Machinery — Removal and Installation of Pilot Shut-Off Valve

BODY (UPPERSTRUCTURE) / Pilot Shut-Off Valve Installation 1. Install pilot shut-off valve (14) to the cockpit with bolts (13) (2 used). : 17 mm 13 14 : 50 N m (5 kgf m, 36 lbf ft) 2. Connect hoses (12, 15, 16 and 17) to pilot shut-off valve (14). : 19 mm : 29.5 N m (3 kgf m, 21.5 lbf ft) : 22 mm : 39 N m (4 kgf m, 28.5 lbf ft) 3. Install lever (4) to block (5) with bolt (1). 17 16 : 29.5 N m (3 kgf m, 21.5 lbf ft) 4. Install spring (8) to block (7) and bracket (9). 5. Install cover (10) to bracket (6) with sems bolts (11) (4 used). : 14 mm W4GB-02-07-003 12 13 14 : 13 mm : 19.5 N m (2 kgf m, 14.5 lbf ft) 6. Install cover (3) to bracket (6) with screws (2) (2 used).

15 W4GB-02-07-002 2 3 4 7 5 6 8 9 1 10 11 W4GB-02-07-001 W2-9-2