Page 7-148 Section 7 – Adjustment, Repair, and Replacement CFP83 Series High Pressure Injector Supply Lines Removal/Installation (Cont) Install Inline Pumps Install the lines in reverse order of removal. Torque Values: Line Fittings: 24 N•m [18 ft-lb] Support Clamp: 6 N•m [53 in-lb] Support Bracket: 24 N•m [18 ft-lb] NOTE : If removed, reinstall the support clamp in the original position, and make sure the lines do not contact each other or another component. Install a protective cover on the injectors and fuel delivery valves to prevent the entry of dirt into the system. Follow-Up Drawing No. 9777, Section 7, Rev. 02-07