Komatsu — WHEN REQUIRED

. MAINTENANCE SERVICE PROCEDURE temporarily. Press the blade against the eliminate the play of bolt (2), then tighten the specified torque. 4 - 30 4. Remove the cutting edg e and the end bit and clean the mounting s urface. 5. Reverse or replace the c utting edge and the end bit when worn ou 1) Remove nut (1) and verse the utting edge and the 2) I nstall the cutting ed bolt round to the Nut Powertilt dozer : 461 ± 69 N ± 51 lb Powertilt , Power pitch dozer : 461 ± 69 Nm (47 ± 7 kgm , 340 ± 51 lbft. Angledozer : 441 ± 49 Nm (4 36.2 lb Semi-U Cutting End bi f bolt (2 ) and nut (1) are da maged, replace them with n ew ones at the same t ime. 6. After several hours of ru nning, retourque the