Komatsu — 6.2.2 USE OF THE DEMOLITION HAMMER AND RULES TO BE OBSERVED

ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER) 2 - Keep the pressure of the excavator on the hammer constant as the bit penetrates in the material. Always follow the hammer in the penetration phase and oper- ate the excavator arms in order to obtain a pressure sufficient to keep the undercarriage raised at about 5 mm (0.2 in) from the ground. Do not raise the undercarriage more than necessary. RWA06420 3 - When working on very hard materials, it is important not to keep hitting the same point for more than 30 seconds. Hit the same point for a few seconds and change position very frequently, in order to facilitate the breaking of the mate- rial.

RWA06430 4 - To facilitate the sliding of the tool on its seat, check the thrust direction and always correct the hitting position of the ham- mer by means of the bucket and arm control. RWA06440 5 - Always check that the arm thrust is optimal, in order to avoid harmful and useless strokes. RWA06450 192