Komatsu — PROCEDURE FOR INCREASING OR REDUCING TRACK FRAME GAUGE

. OPERATION TRANSPORTATION PROCEDURE FOR INCREASING OR REDUCING TRACK FRAME GAUGE WARNING Reducing Track Gauge center frame mounting bolts (1). (one side, front + side, on the 3 - 145 Never use the machine for o perations with th e track frame retracted. 1. Remove rear: 16 2. Swing th e upper stru cture so th at it is at 90° on th e side of track frame (A ) to be retrac ted, then use t he wor k equipmen t to jack up the tr ack frame. 3. Set bloc ks (B) (20 to 30 cm (8 t o 12 in ) wooden blocks) t owards the outs ide of track f rame (A) , then use th boom cylinder to lower th e machine s lowly. Th e trac wil stop wh en it contacts the stopper. 4.

Lower t he machine carefully and i front + r ear: 8 bolts o ut of bolt s (1)) 5. Tightening torque: 1 960 - 245 0 Nm 00 - 250 kgm , 1450 - 1810 frame 6. other si