. OPERATION TROUBLES AND ACTIONS OPERATION TROUBLES AND ACTIONS engine will start. PHENOMENA THAT ARE NOT FAILURES 3 - 154 4. Carry out p riming approx. 50 times with priming pum p (3) of the supply pum p. Tighten but securely. terfly nut (2) holding the lever of the priming pump Target tight Turn the ke ening torque: 11.80 Nm ( 1.2 kgm , 8.7 lbft) y in the starting switch to the START position. The Note that the fo llowing phenomena are no When the ar m control lever is operated t o the IN positi on and the work equipm ent is lowered unde r no lo ad from a hig h position, the arm spe ed will drop m or less at the v ertical position.
When the bu cket control le ver is operat ed to the CUR L position and the wor k equipment is bucket spee lowered und er no load fr om a high position, the d will drop momentarily when the on. bucket teeth are more or le ss at t he hor izontal positi The bucket or arm will fluctuate by itself during heavy-duty ations. ctuat eavy-duty digging oper When startin g or stopping t he swing, no ise will be e mitted from the brake When going down a steep slope at low speed, a noi se will be emitted f rom the trave l motor brake valv