Komatsu — EVERY 500 HOURS MAINTENANCE

. MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE 4 - 57 7. Remov e undercover (11) and (12), th en evacuate all mud, dirt, or leave s to the outside of the machi 8. Push in cleane d net (3) b ack to the o rigina it with s crew (2 9. Install c over (4 ) with bolts 10. Install t he undercover (11 place and secure Next, clean and ch eck the PT O oil coole r, too. 11. Open th e door at the rear left of the machine. 12. Check t he front face and r ear face of PTO oil cooler (13), and use compresse 13. Remov e undercover(14), then evacu ate all mud, dirt, or leaves to the o utside o f the mach 14. Install u nderco