Komatsu — FINAL DRIVE

DISASSEMBLY AND ASSEMBLY FINAL DRIVE # Install the lock plate as shown in the diagram. Thread of mounting bolt: Thread tightener (LT-2) # Do not coat the tap portion of the nut with thread tightener (LT-2). 3. No. 2 carrier assembly a. Assembly No. 2 carrier assembly as follows. # Replace thrust washers (20), (23) and pin (17) with new ones. # There are the remains of the caulking when the pin is inserted at the end face of hole h at the side of the carrier, so remove the caulked metal from the inside diameter of the hole before starting to assemble. i. Assemble bearing (22) to gear (21), fit top and bottom thrust washers (20) and (23), and set gear assembly in carrier (19). ii.

Align position of pin holes of shaft and car- rier, then tap with a plastic hammer to install shaft (18). # When installing the shaft, rotate the planetary gear. Be careful no to damage the thrust washer. iii. Insert pin (17). # After inserting the pin, caulk the pin portion of the car- rier. # After assembling the carrier assembly, check that gear (21) rotates smoothly. b. Install No. 2 carrier assembly (16). # Align the position so that the three tips of the gear shafts of carrier assembly (16) enter the three hollows in the end face of the motor case, then install. 30-51