Komatsu — FINAL DRIVE

DISASSEMBLY AND ASSEMBLY FINAL DRIVE 4. Install thrust washer (15). 5. Install No. 2 sun gear (14). 6. Install thrust washer (13). 7. Install No. 1 sun gear shaft (11). 8. No. 1 carrier assembly. a. Assemble No. 1 carrier assembly as follows. # Replace thrust washers (7), (10) and pin (4) with new ones. # There are the remains of the caulking when the pin is inserted at the end face of hole h at the side of the carrier, so remove the caulked metal from the inside diameter of the hole before starting to assemble. i. Assemble bearing (9) to gear (8), fit top and bottom thrust washers (7) and (10), and set gear assembly in carrier (6). ii.

Align position of pin holes of shaft and car- rier, then tap with a plastic hammer to install shaft (5). # When installing the shaft, rotate the planetary gear. Be careful no to damage the thrust washer. iii. Insert pin (4). # After inserting pin, caulk the pin portion of the carrier. # After assembling the carrier assembly, check that gear (8) rotates smoothly. b. Install No. 1 carrier assembly (3). 9. Install spacer (2). 30-52