Komatsu — ASSEMBLY OF TRACK ROLLER ASSEMBLY

DISASSEMBLY AND ASSEMBLY TRACK ROLLER 9. Using tool K 2 , apply basic pressure to roller oil filler port, and check for leakage of air from seal. # Basic pressure: 98kPa (1 kg/cm 2 ) # Method of checking The basic pressure shall be maintained for 10 seconds and the indicator of the gauge shall not go down. 10. Using tool K 2 , fill track roller assembly with oil, then tighten plug (11). Plug: 14.7 ± 4.9 Nm (1.5 ± 0.5 kgm) Track roller oil: 190 - 215 cc (SAE30) 30-77