Komatsu — ASSEMBLY OF CARRIER ROLLER ASSEMBLY

DISASSEMBLY AND ASSEMBLY CARRIER ROLLER 8. Fit O-ring and install cover (2). 9. Using tool L 2 , apply basic pressure to roller oil filler port, and check for leakage of air from seal. # Basic pressure: 98 Kpa (1 kg/cm 2 ) # Method of checking The basic pressure shall be maintained for 10 seconds and the indicator of the gauge shall not go down. 10. Using tool L 4 , fill carrier roller assembly with oil, then tighten plug (1). Carrier roller oil: 230 - 250 cc (SAE30) 30-81