DISASSEMBLY AND ASSEMBLY TRACK SHOE REMOVAL OF TRACK SHOE ASSEMBLY 1. Stop machine at a point where master pin is midway between idler and carrier roller, and where there is space to lay out track assembly on ground. 2. Lower work equipment, then loosen lubricator (1), and relieve track tension. The adjustment cylinder is under extremely high pres- sure. Never loosen the lubricator more than one turn. If the grease does not come out, move the machine backwards and forwards. 1 3. Using tool I , pull out master pin (2) 2 4. Remove tool I , and move machine forward so that position of temporary pin b is at front of idler, and set block a in position. 5.
Remove temporary pin b , and remove dust seal, then drive machine in reverse to lay ou track (3). 3 INSTALLATION OF TRACK SHOE ASSEMBLY 1 # Adjust the track tension. For details, see TEST- ING AND ADJUSTING, Testing and adjusting track tension. 2 # Use tool I and press fit so that the protrusion of the master pin is dimension “ a Protrusion “ a ” of master pin: 4 ± 2 mm 3 # When assembling the dust seal, coat the bushing contact surface with grease (G2-LI). 30-82