Freightliner — Freightliner Business Class M2 Workshop Manual

Double Check Valve 42.20 Double Check Valve Operating and Leakage Test Operating and Leakage Test the first port for leakage using a soap so- lution. A 1-inch (2.5-cm) bubble or less in 5 seconds is allowable. Connect the line to the inlet port. Repeat this step, check- ing the opposite inlet port for leaks. 1. If testing the valve while in the vehicle, proceed as follows: 1.1 Push in and release the foot brake pedal while checking that the brakes apply and release on both the tractor and trailer. 3.4 If the double check valve does not func- tion as described, or if the leakage is ex- cessive, replace it. See Subject 120 for instructions.

1.2 Apply and release the trailer control valve while checking that only the trailer brakes apply and release. If the valve cannot be replaced, repair it using Bendix parts. See Subject 130 for instructions. 1.3 Apply the trailer control valve and check the exhaust port of the foot brake valve for leakage using a soap solution. A 1-inch (2.5-cm) bubble or less in 5 sec- onds is allowable. Release the valve. 1.4 Disconnect the air line from the trailer control valve exhaust port. Push the foot brake pedal until it stops and hold it in place. Check the trailer control valve ex- haust port for leakage using a soap solu- tion. A 1-inch (2.5-cm) bubble or less in 5 seconds is allowable.

1.5 Connect the air line to the trailer control valve exhaust port. 1.6 If the double check valve does not func- tion as described, or if the leakage is ex- cessive, replace it. See Subject 120 for instructions. If the valve cannot be replaced, repair it using Bendix parts. See Subject 130 for instructions. 2. Connect two separately controlled air supplies to the inlet ports. 3. If bench testing the valve, proceed as follows. 3.1 Apply and release air to one inlet port (foot brake pedal) while checking that the test gauge registers the application and release.

3.2 Apply and release air to the other inlet port (trailer control valve) while checking that the gauge registers the application and release. 3.3 Disconnect the line from one of the double check valve inlet ports. Apply air to the opposite inlet port while checking Business Class M2 Workshop Manual, Supplement 0, January 2002 110/1