Freightliner — Freightliner Business Class M2 Workshop Manual

AD-IS Air Dryer, Bendix 42.33 General Information 11 10 12 13 14 9 8 15 6 7 5 A B C D 3 4 16 17 18 19 2 20 21 1 03/21/2011 f430538 NOTE: All pressure protection valves are shown open. 1. Compressor 2. Engine Turbo 3. Safety Valve 4. Purge Valve (open) 5. Turbo Cutoff Valve (closed) 6. Inlet Port 7. Purge Control Channel 8. Unloader Port 9. Governor 10. Delivery Check Valve (closed) 11. Desiccant Bed 12. Oil Separator 13. Purge Orifice 14. Purge Reservoir 15. Pressure Protection Valves 16. Primary Port 17. Secondary Port 18. Auxiliary Ports 19. Purge Reservoir Drain Valve 20. Secondary Reservoir 21. Primary Reservoir Fig.

3, Air Dryer Purge Cycle Business Class M2 Workshop Manual, Supplement 20, September 2011 050/4