AD-IS Air Dryer, Bendix 42.33 General Information 12 11 13 14 15 10 9 16 7 8 6 A B C D 3 5 17 18 19 4 20 2 21 22 1 03/21/2011 f430537 1. Compressor 2. Engine Turbo 3. Safety Valve 4. Purge Control Channel Drain 5. Purge Valve (closed) 6. Turbo Cutoff Valve (open) 7. Inlet Port 8. Purge Control Channel 9. Unloader Port 10. Governor 11. Delivery Check Valve (open) 12. Desiccant Bed 13. Oil Separator 14. Purge Orifice 15. Purge Reservoir 16. Pressure Protection Valves 17. Primary Port 18. Secondary Port 19. Auxiliary Ports 20. Purge Reservoir Drain Valve 21. Secondary Reservoir 22. Primary Reservoir Fig.
2, Air Dryer Charge Cycle Business Class M2 Workshop Manual, Supplement 20, September 2011 050/3