Freightliner — Freightliner Business Class M2 Workshop Manual

AD-IS Air Dryer, Bendix 42.33 General Information 1 2 12 13 3 17 4 14 16 11 15 5 6 7 8 9 10 03/17/2011 f430536 1. Governor Reservoir 2. Delivery to Secondary Reservoir 3. Delivery to Primary Reservoir 4. Pressure Protection Valves 5. Purge Valve 6. Purge Reservoir 7. Governor Unloader 8. Governor 9. Governor Exhaust 10. Supply from Compressor 11. Mounting Bolts (3) 12. Desiccant Cartridge 13. Safety Valve 14. Heater/Thermostat 15. Pressure Protection Valves (4) 16. Auxiliary Delivery Ports (4) 17. Auxiliary Delivery Ports (2) Fig. 1, AD-IS Air Dryer housing.

With the turbo cutoff valve seated (closed position), air in the compressor discharge line and air dryer inlet port cannot enter the air dryer. This main- tains turbocharger boost pressure to the engine. Business Class M2 Workshop Manual, Supplement 20, September 2011 050/2