AD-IS Air Dryer, Bendix 42.33 Operating and Leakage Tests WARNING 9. Check the operation of the end cover heater and thermostat assembly during cold-weather opera- tion as follows: Before working on or around air brake systems and components, see Safety Precautions 100 . Failure to do so may result in personal injury. 9.1 Check the electric power to the air dryer. With the ignition or engine kill switch in the ON position, check for voltage to the heater and thermostat assembly using a voltmeter or test-light. Unplug the electri- cal connector at the air dryer and place the test leads on each of the connections of the female connector on the vehicle power lead.
If there is no voltage, look for a blown fuse, broken wires, or corrosion in the vehicle wiring harness. Check to see if a good ground path exists. Operational Tests 1. Shut down the engine, and chock the tires. 2. Install a pressure gauge in one of the spare gov- ernor ports labeled "RES." 3. Close all drain cocks and start the engine. Build the air system to governor cutout, then shut down the engine. 4. Check all air lines and fittings leading to and from the air dryer for leakage. Note the pressure on the air gauge after the governor cutout pres- sure is reached, a rapid loss of pressure could indicate a leaking delivery port check valve or turbo cut-off valve.
9.2 Test the thermostat and heater operation. Turn off the ignition switch and cool the thermostat and heater assembly to below 40°F (4°C). Using an ohmmeter, check the resistance between the electrical pins in the air dryer connector half. The resis- tance should be 1.5 to 3.0 ohms for the 12-volt heater assembly and 6 to 9 ohms for the 24-volt heater assembly. 5. To check for delivery check valve leakage, allow the system air pressure to charge and listen for the air dryer to purge. The purge should last about 30 seconds. Warm the thermostat and heater assembly to about 90°F (32°C) and check the resis- tance again. The resistance should ex- ceed 1000 ohms.
If the resistance values obtained are within the stated limits, the thermostat and heater assembly is operat- ing properly. If the resistance values ob- tained are outside the stated limits, re- place the heater and thermostat assembly. For instructions, see Subject 150 . 6. Gradually open the drain cock on the purge tank and exhaust any residual pressure. 7. Coat the drain cock with a soap solution. If leak- age does not exceed a 1-inch (25-mm) bubble in 1 second, go to step 9. If leakage does exceed a 1-inch (25-mm) bubble in one second, proceed with the following step. 8. Apply the brakes a few times, bring the air pres- sure to a point below governor cut-in (about 95 psi [655 kPa]).
The governor will then signal the end of the purge cycle, closing the turbo cut-off valve. Allow any delivery line air pressure to drain, then check again for leakage at the purge tank drain cock. If excessive leakage has stopped, the turbo cut-off valve should be checked. NOTE: If after replacing the delivery check valve, rapid loss of system air pressure contin- ues, the delivery check valve and turbo cut-off valve are still leaking. Check the valves. 10. Check the pressure protection valves. Observe the pressure gauges of the vehicle as system pressure builds from zero.
The primary gauge should rise until it reaches approximately 109 psi (752 kPa), then level off as the second pressure protection valve opens and allows the secondary volume to build. When the secondary pressure gauge passes through approximately 55 and 85 psi (379 and 586 kPa) there should be an asso- ciated leveling off of pressure as the third and fourth pressure protection valves open. Then, both the primary and secondary gauges should reach their full pressure of about 130 psi (896 kPa). Business Class M2 Workshop Manual, Supplement 20, September 2011 170/1