Aftertreatment System, EPA10 49.02 DDC 2V2 ATD and SCR Catalyst Removal and Installation General Information 8. Disconnect and cap/plug the DEF lines from the metering unit. Removing the DDC 2V2 ATD and SCR catalyst as a unit is the quickest, and easiest, way to remove it from the vehicle. The ATD or the SCR catalyst can be removed separately. When removing the compo- nents separately, mark all parts to assist in proper assembly. Daimler Trucks North America LLC does not recommend disassembling the ATD on the ve- hicle. Remove the component following the instruc- tions below, and then disassemble it on a workbench following the instructions in the engine manufactur- er’s service literature.
9. Remove the metering unit mounting plate with the metering unit attached. 10. Loosen the lower fasteners on the diagonal sup- port brace. Disconnect the diagonal support brace from the lifting bracket that attaches to the vertical stanchion and swing it out of the way. Secure it as needed. 11. Disconnect the exhaust pipe at the intake to the ATD. Support it as needed so there is no stress on the bellows. WARNING 12. Position the overhead lifting device over the ver- tical stanchion and connect the hooks at the lift- ing points. Apply enough pressure to the lift points to prevent the unit from dropping when loosened.
Aftertreatment Device (ATD) internal tempera- tures can remain hot enough to cause personal injury, or ignite combustible materials, for hours after the engine is shut down. To avoid potentially serious burns or material damage: 13. Remove the four mounting fasteners that attach the vertical stanchion to the frame rail. 14. Lower the unit away from the vehicle. Installation Let the ATD cool before handling it; be espe- cially careful when opening it to expose the DPF. 1. Using the overhead lifting device, position the unit at the frame rail, and install the mounting fasteners. Tighten 159 to 201 lbf·ft (212 to 268 N·m). Wear appropriate protective gear.
Be careful not to place the ATD where flam- mable gases or other combustible materials may come into contact with hot interior parts. 2. Position the diagonal support brace and install the mounting fasteners. Tighten the upper and lower fasteners 49 to 63 lbf·ft (66 to 86 N·m). ATD and SCR Catalyst Removal and Installation 3. Connect the two 14-pin connectors at the sensor box. Removal 4. Install the metering unit and mounting plate. 5. Connect the wiring connectors to the metering unit. Refer to Fig. 1 for the following procedure. 1. Shut down the engine and chock the tries. 2. Allow the ATS time to cool. 6. Connect the air lines to the metering unit. 3. Remove the heat shield. 7.
Connect the DEF lines to the metering unit. 8. Using a new seal, connect the exhaust pipe to the ATD. See Fig. 2 for proper installation. Tighten the clamp 114 to 126 lbf·in (1290 to 1425 N·cm). 4. Remove the exhaust stack from the SCR cata- lyst. 5. Disconnect the two 14-pin connectors at the sen- sor box. 9. Install the exhaust stack. Tighten the clamp 27 to 37 lbf·ft (37 to 50 N·m). 6. Disconnect the wiring connectors from the meter- ing unit. 10. Install the heat shield. Tighten 13 to 17 lbf·ft (18 to 22 N·m). 7. Disconnect the air lines from the metering unit. Business Class M2 Workshop Manual, Supplement 17, March 2010 150/1