Aftertreatment System, EPA10 49.02 DDC 2V2 ATD and SCR Catalyst Removal and Installation 7 6 6 8 4 9 3 02/16/2010 f490406 1 2 1. Heat Shield 2. Inlet Clamp 3. Vertical Stanchion 4. Diagonal Support Brace 5. Sensor Box 6. Lifting Points 7. Metering Unit and Mounting Plate 8. Exhaust Stack 9. Exhaust Pipe 11. Start the engine and check for leaks. Tighten any connections as needed. ATD Removal and Installation Fig. 1, 2V2 ATD and SCR Catalyst Installation Refer to Fig. 3 for the following procedure. Business Class M2 Workshop Manual, Supplement 17, March 2010 150/2 5