Aftertreatment System, EPA10 49.02 DDC 2V2 ATD and SCR Catalyst Removal and Installation 1 2 3 4 10. Remove the metering unit mounting plate with the metering unit attached. 11. Loosen the lower fasteners on the diagonal sup- port brace. Disconnect the diagonal support brace from the vertical stanchion, and swing it out of the way. Secure it as needed. 12. Remove the intake and outlet clamps from the ATD. Support the turbo outlet pipe as needed so there is no stress on the bellows. A 13. Position the overhead lifting device over the ATD and connect the hooks at the lifting points. Apply enough pressure to the lift points to prevent the unit from dropping when loosened. 14.
Remove the mounting clamps. 02/16/2010 NOTE: Clamp and seal are directional. A. Correct Clamp and Seal Installation f490420 15. Lift the ATD away from the vehicle. 1. ATD 2. Clamp 3. Gasket 4. Exhaust Pipe Installation 1. Using the overhead lifting device, position the ATD on the vertical stanchion, and secure it in position with the mounting clamps. Do not tighten the straps at this time. Fig. 2, Spherical Clamp Installation NOTICE 2. Align the connection with the SCR catalyst, and using a new seal, install the clamp. See Fig. 2 for proper installation. Tighten the clamp 114 to 126 lbf·in (1290 to 1425 N·cm). Alignment is essential.
Mark every component’s position prior to disassembling it on the truck. Improper assembly may result in leaks or dam- age to the ATS. Removal 3. Align the connection with the exhaust pipe from the turbocharger, and, using a new seal, install the clamp. See Fig. 2 for proper installation. Tighten the clamp 114 to 126 lbf·in (1290 to 1425 N·cm). 1. Shut down the engine and chock the tries. 2. Allow the ATS time to cool. 4. Check all alignment marks, and tighten the clamping strap nuts incrementally, first 15 lbf·ft (20 N·m), then 30 lbf·ft (40 N·m). 3. Remove the heat shield. 4. Disconnect the two pressure tubes at the con- nection to the ATD. Install the jam nuts.
Using a back-up wrench, tighten 30 lbf·ft (40 N·m). 5. Disconnect the three temperature sensors on the ATD. 5. Connect the two pressure tubes. 6. Disconnect the two 14-pin connectors at the sen- sor box. 6. Connect the three temperature sensors. 7. Disconnect the wiring connectors from the meter- ing unit. 7. Position the diagonal support brace and install the mounting fasteners. Tighten the upper and lower fasteners 49 to 63 lbf·ft (66 to 86 N·m). 8. Disconnect the air lines from the metering unit. 8. Connect the two 14-pin connectors at the sensor box. 9. Disconnect and cap/plug the DEF lines from the metering unit. 9. Install the metering unit and mounting plate. 10.
Connect the wiring connectors to the metering unit. Business Class M2 Workshop Manual, Supplement 17, March 2010 150/3