Aftertreatment System, EPA10 49.02 DDC 2V2 ATD and SCR Catalyst Removal and Installation 01/27/2010 f490407 1. Heat Shield 2. Exhaust Pipe 3. Intake Clamp 4. Clamping Strap Nuts 5. Temperature Sensor 6. Pressure Tube 7. Clamping Strap 8. Lifting Points 9. ATD 10. Diagonal Support Brace 11. Outlet Clamp 12. Metering Unit and Mounting Plate 13. Exhaust Stack 14. Sensor Box Fig. 3, 2V2 ATD Installation 11. Connect the air lines to the metering unit. 13. Install the heat shield. 12. Connect the DEF lines to the metering unit. 14. Start the engine and check for leaks. Tighten any connections as needed.
Business Class M2 Workshop Manual, Supplement 17, March 2010 150/4 12 13 14 11 10 9 8 6 5 5 7 6 5 2 4 3 14