Freightliner — Freightliner Business Class M2 Workshop Manual

Batteries 54.03 Battery Removal, Cleaning and Inspection, and Installation those are 10 to 15 lbf·ft (14 to 20 N·m). Proper torque is important for electrical system opera- tion. 1 8. Start the engine and check the operation of the charging system. If needed, adjust or repair the charging system to obtain the correct charging output. For instructions, see the appropriate sec- tion in Group 15 . 2 3 4 5 CAUTION Make sure all battery posts are covered with pro- tective caps. Failure to do so could cause the battery box cover to short across the posts. 6 8 7 9 1 10 10 11 11/06/2001 f543938 1. Carrier and Cover 2. 3/8–16 Nut 3. Washer 4. Holddown Bolt 5. Battery Holddown 6. Battery 12 7.

Liner 8. 5/16–18 Nut 9. Washer 10. Mounting Bracket 11. Washer 12. Capscrew Fig. 1, Battery Box, Battery, and Battery Holddown 6.3 Install the negative battery jumper post. 6.4 Install the negative battery cable lead. CAUTION Reversed polarity may cause serious damage to the electrical system. 7. Tighten all battery connections to the torque specifications listed on the battery. Generally Business Class M2 Workshop Manual, Supplement 10, September 2006 160/2