Freightliner — Freightliner Business Class M2 Workshop Manual

Batteries 54.03 Battery Removal, Cleaning and Inspection, and Installation WARNING Installation Before doing any of the following procedures, read the instructions in Subject 120 . Failure to follow the safety precautions could result in per- sonal injury. 1. Be sure that the battery to be installed has a suf- ficient capacity to cover the electrical needs of the vehicle. For more information, see Sub- ject 100 . Removal CAUTION 1. Before working on the battery, make sure all electrical loads such as lights, ignition, and ac- cessories, are turned off.

Using an under-capacity battery will result in poor performance and premature battery failure, resulting in damage or reduced life of the starter. 2. Remove the battery box cover. 2. Be sure the battery is at full charge when in- stalled. If the battery has been in storage for some time, or if the installation is being made in subfreezing temperatures, give the battery a boost-charge before installing it. For instructions, see Subject 150 . 3. Disconnect the negative battery cable lead. 4. Disconnect the negative battery jumper post. 5. Disconnect the positive battery cable lead. 6. Disconnect the positive battery jumper post. 7. Remove the battery holddown and retainer if so equipped.

Then remove the batteries from the carrier. 3. Place the batteries in the carrier with the termi- nals in the proper position as referenced earlier. The batteries should rest level in the carrier. 4. Install the battery holddown and tighten it until the batteries are secure. See Fig. 1 . Cleaning and Inspection CAUTION 1. Inspect all battery cables and interconnectors for wear, and replace them if necessary. Remove corrosion from cables, terminals, and battery posts with a wire brush and a solution of baking soda and water. Rinse thoroughly with clean water, and dry. Do not overtighten the battery holddown. Over- tightening could damage the batteries. 5.

To provide corrosion protection, apply pumpable dielectric grease (48-02349-000) liberally to the terminal pads, then install the interconnectors. For a list of approved suppliers, see Specifica- tions 400 . 2. Clean and tighten the battery ground cable at the weld stud on the frame rail. There are two loca- tions to service. First at the battery and, second at the engine behind the left wheel. Inspect and ensure that the nut is self-locking and that a flat washer is used. Do not use a split-lock washer or star washer. Torque the nut 15 to 18 lbf·ft (20 to 24 N·m). Seal the area with red dielectric spray enamel sealant. IMPORTANT:

Many electrical components are located outside of the cab in areas subjected to harsh weather and road spray. Some compo- nents also have exposed metal electrical termi- nals, which, when subjected to harsh conditions, may suffer corrosion at the electrical connection. Spray dielectric sealant on all exposed electrical terminals and use dielectric grease on all cov- ered terminals. 3. Inspect the retainer assembly and battery box. Replace worn or damaged parts. Remove any corrosion with a wire brush and wash with a weak solution of baking soda and water. Rinse with clean water and dry. To prevent rusting, paint the retainer assembly if needed. 6.

Connect the battery cables to the batteries and check for correct polarity with respect to the ve- hicle. Connect the ground cable last. 4. Be sure foreign objects, such as stones, bolts, and nuts, are removed from the battery box. 6.1 Install the positive battery jumper post. 6.2 Install the positive battery cable lead. Business Class M2 Workshop Manual, Supplement 10, September 2006 160/1