Freightliner — Freightliner Business Class M2 Workshop Manual

Body Builder Engine Interfaces 54.36 Engine Cruise Control Harness Installation 1 5 2 3 4 6 11/15/2005 f544716 1. Splice Pack 13 2. Splice Pack 1 3. Splice Pack 9 4. Splice Pack 12A 5. Dash Electronic Control Unit 6. VC3 18-pin Connector Fig. 1, Main Dash ECU Harness Routing work and to configure the rpm settings in power takeoff (PTO) mode. be at least equal to or greater than 10703, and less than or equal to 10702. 17.1 Set parameter 11311 to zero (Cruise Switch On, Hardwired, or J1939 will be displayed). 18.4 Program 10712 to the speed desired (if different on initial startup) for the Cruise Control Resume switch input.

The setting needs to be at least equal to or greater than 10703, and less than or equal to 10702. 17.2 Set parameter 11312 to zero (Set/Coast and Resume/Accel, Hardwired, or J1939 will be displayed). 17.3 Set parameter 11313 to zero (Cruise Pause, Hardwired, or J1939 will be dis- played). 18.5 10715 is the ramp rate and it should be adjusted to 250 rpm/second. 19. Verify that the cruise and engine PTO function correctly. 18. Set the following parameters as needed. 20. Remove the chocks from the tires. 18.1 Program 10702 to the MAXIMUM RPM for PTO mode; this is the highest speed that the Cruise Control Resume input will reach.

18.2 Program 10703 to the MINIMUM RPM for PTO mode; this is the lowest speed that the Cruise Control Set input will reach. 18.3 Program 10709 to the speed desired (if different on initial startup) for the Cruise Control Set switch. The setting needs to Business Class M2 Workshop Manual, Supplement 10, September 2006 100/2