Freightliner — Freightliner Business Class M2 Workshop Manual

Refrigerant Compressor, Sanden 83.01 Refrigerant Compressor Removal and Installation Removal 1.2 Turn the compressor shaft several times by hand to distribute oil which has settled in the cylinder. WARNING 2. If installing a new compressor, adjust the refriger- ant oil level in the new compressor. For instruc- tions see, Subject 130 . Before doing any work, read the information in Safety Precautions 100 . Failure to read the safety precautions and to be aware of the dangers in- volved when working with refrigerant could lead to serious personal injury. 3. Using capscrews and washers, install the com- pressor on the mounting bracket. Torque the capscrews 15 to 19 lbf·ft (20 to 26 N·m). 1.

Turn off the engine, apply the brakes, and chock the tires. 4. Uncap the discharge and suction ports and the refrigerant lines. Check the refrigerant lines and the discharge and suction ports. They must be clean and free of nicks, gasket residue, and other foreign material. 2. Recover the refrigerant from the air conditioning system. For instructions, see Section 83.00 , Subject 220. 3. Remove the serpentine belt. Do not pry or roll the belt off the pulleys. 5. Using only Mini Stat-O-Seals, replace the Mini Stat-O-Seals on the refrigerant lines. Do not lu- bricate the Mini Stat-O-Seals prior to installation. 4. Disconnect the wiring harness from the compres- sor. 6.

Connect the refrigerant lines to the compressor. Torque the retaining plate 11 to 15 lbf·ft (15 to 20 N·m). 5. Disconnect the discharge and suction lines from the compressor. Quickly cap the discharge and suctions ports and the refrigerant lines. 7. Connect the wiring harness to the compressor. IMPORTANT: Under no circumstances should the ports on the compressor or the refrigerant lines remain uncapped for longer than five min- utes. Water and dirt can damage the refrigerant system. Do not blow shop air through refrigerant lines since shop air is wet (humid). 8. Install the serpentine belt. 9.

If installing a new compressor or if the system was without any refrigerant pressure before re- pairs were started, replace the receiver-drier. For instructions, see Section 83.00 , Subject 180. If the compressor is not being replaced, check the moisture indicator on the receiver-drier. If it is not cobalt blue, replace the receiver-drier. For instructions, see Section 83.00 , Subject 180. 6. Being careful not to spill any refrigerant oil, re- move the capscrews and washers that attach the refrigerant compressor to the engine and remove the compressor. 10. Evacuate, charge, and leak test the refrigerant system. For instructions, see Section 83.00 , Subject 220. Installation 11.

Lower the hood. IMPORTANT: A new compressor is filled with refrigerant oil and nitrogen gas. The quantity is printed on a label attached to the compressor. When installing a new compressor on the ve- hicle, do all of the steps below. If installing a used compressor, disregard the first step. 12. Remove the chocks from the tires. 1. Prepare a new compressor. 1.1 Gently release the nitrogen gas from the discharge side of the compressor. Be careful not to let the oil flow out. Business Class M2 Workshop Manual, Supplement 0, January 2002 120/1