Komatsu — EVERY 2000 HOURS MAINTENANCE

. MAINTENANCE MAINTENANCE PROCEDURE fully to the boom charge pressure of the accumulator has gone down. Please contact your Komatsu 4 - 74 3. K equipme maximu ach arting switch to the OFF position (A), and stop the engine. 4. T urn the starting switch to the ON position rn the 5. S et the lock leve r to the F REE position (F). 6. O perate the wo rk equipment control lever . ever L OWER position REMA RK Chec k that t he area around t he machin e is saf e, the n operate the work equipmen t control lever to the LOWER po sition . 7. C heck t hat t he w ork equip ment goe s down t o the ground under s own weight. 8.

T his completes t he inspe NOTIC E If the nitrogen gas charge pressu re in the ac cumulato r is lo w and operations are contin ued, it will bec ome impossible to re lease the re maining pressure inside th e hydraulic circuit if a failu re occurs on the machine. I n the following distributor. W ork equipment does not St ops while goin g down