Komatsu — TRAVEL PPC SHUTTLE VALVE

STRUCTURE, FUNCTION, & MAINTENANCE STANDARD TRAVEL PPC SHUTTLE VALVE 12 2. When travel lever is operated If the right travel lever is set in the reverse (or for- ward) direction, the right travel reverse (or forward) PPC pressure pushes spool (7) to the left (or right). Spool (7) pushes piston (3) to close orifice (5) and shut off stroke regulation signal chamber "a" from the drain circuit of the travel PPC valve. At this time, the right travel reverse (or forward) PPC pressure is applied through orifice (6) of piston (4) to the left end of piston (8) to push piston (8) to the right.

When boom RAISE, arm IN, OUT, bucket CURL, DUMP are operated, spool (1) moves to the left, but the maximum stroke of the spool is limited to st1, the amount of movement (st2) of piston (8). PC210/240-7K 10-113